Preloader
UK   UAE   

Holiday INN PROJECT

 
A Refurbishment of Pool & Spa

Project Description

Project Type – Indoor Swimming Pool

Pool Size – 9m x 4m x 1.2m~1.8m (variable depth)

Location – Kensington – London – UK 

Dosing System – Automatic Water System 

Project Brief – We carried out a complete refurbishment of the swimming pool and spa systems, including the installation of a new automatic chemical dosing system to maintain optimal water quality. Our work also included upgrading the sauna and steam room systems, improving their performance, efficiency and reliability. With our expertise in swimming pools and wellness facilities, we ensured all systems were professionally installed and refurbished to deliver a safe, comfortable and relaxing experience. Have a look below for more project details.

holiday inn pool 2d plan by luxpoolholiday inn pool 2d plan by luxpool uk uae

2D/3D Plan

holiday inn hotel spa drawings 2d
holiday inn hotel spa 3d drawing
holiday inn pool 3d plant room
holiday inn pool plant room

Before

After